How to use this calculator
- Enter the slab length and width.
- Choose the bar spacing and size your plan calls for.
- Add a lap and waste allowance and read the bars, sticks and weight.
How a rebar grid is counted
A grid has bars running both ways. The number of bars in one direction is the other dimension divided by the spacing, plus one. Multiply by each bar length and add the two directions.
Add about 10 percent for laps and cuts, divide by 20 ft to get sticks, and multiply by the weight per foot for the weight. Bars are normally kept off the ground on chairs and tied at the crossings.
Frequently asked questions
How much rebar for a 20x12 slab?
At 12 in spacing you need 13 bars of 20 ft and 21 bars of 12 ft, about 512 ft before laps.
What spacing should I use?
Patios and driveways commonly use 16 to 18 in with #3 or #4 bar; follow your plan or engineer.
What is the weight of #4 rebar?
0.668 lb per foot.
Do I need rebar or wire mesh?
Both are used. Rebar gives more strength for heavy loads; mesh helps control cracking in thin slabs. Ask your engineer.